Build Over Sewer / Build Over Storm Water
Planning a construction project? Specific regulations apply, when building near or over sewer and/or storm water mains. One particular requirement is that you supply a ‘Build Over Infrastructure CCTV Survey’. Contact the relevant local authority to ensure you meet all of their specifications.
Why you need a Build Over Infrastructure CCTV Survey
‘Build Over Infrastructure’ means your proposed construction project will be built close to existing storm water and /or sewerage mains. Thus, the term ‘Build Over Sewer’ ‘Build Over Storm Water’.
Final building approval is granted, when regulations are met. Construction projects may include; but are not limited to, new builds, renovations, extensions, retaining walls and shade shelters.
Knowing where the drains are helps you plan your construction. Also the condition of the drain means you can build with confidence. Existing defects can be rectified by the relevant party prior construction,
Eliminating risk and providing assurance.
Dial Before You Dig is a great resource to identify underground infrastructure, which may run in close proximity to your project.
How Can dRAINS kLEEN Help
Provision of Build Over Infrastructure CCTV Survey and associated condition report for the affected asset, is a dRAINS kLEEN specialty.
Each Build Over Infrastructure CCTV survey is completed by a WSA accredited operator; in accordance with the SEQ Water Supply / Sewerage Design and Construction Code.
Using (robotic) tracked cameras with 360deg rotatable head & zoom capabilities. We produce clear footage showing the internal structure of the pipes, as well as comprehensive reports including photos. Defects are coded accurately in WinCan, before generating a report suitable for submission, evaluation and approval.
Who Owns the Drain Infrastructure
Sewage and storm water networks are each owned by different organisations. Storm water is a Council asset, Sewage and Water are owned by your local Utility. Therefore, you must seek approval from the appropriate party, before construction starts.
Infrastructure Plans
For dRAINS kLEEN to quote and complete a Build Over Infrastructure CCTV Survey. Initially we request a copy of the infrastructure plan specific to your property.
Being able to understand the location of the manholes, allows us to provide accurate pricing. Referencing the correct asset numbers from the plan is also a requirement for correct reporting.
Follow this link to access SCC My Maps for detailed storm water, electrical and communication infrastructure on the Sunshine Coast. https://www.sunshinecoast.qld.gov.au/Development/Development-Tools-and-Guidelines/Sunshine-Coast-Mapping-MyMaps
Unity Water Infrastructure plans can be found here https://www.arcgis.com/apps/webappviewer/index.html?id=5df6f0c04d68433b8e3d4f546ba6187a
Build Over Infrastructure Application
Further information relating to each of the local authorities (dependant on your location) can be found here.
Unity Water’s (UW) requirements for Build Over Sewer and application form https://www.unitywater.com/residential/building-and-landscaping/building-over-pipes-and-easements
Urban Utilities (QUU) requirements for Build Over Sewer https://www.urbanutilities.com.au/development/our-services/build-over-or-near-pipes
Brisbane City Council (BCC) link for Build Over Storm water applications https://www.brisbane.qld.gov.au/planning-building/applying-post-approval/preparing-application/development-application-forms
Sunshine Coast Council (SCC) : Build Over Storm water – Link for Building approvals https://www.sunshinecoast.qld.gov.au/Development/Building-and-Plumbing/Plumbing-and-Building-Approvals
Contact us today, to carry out your Build Over CCTV Survey